Sanding Machine NewsTenders

Tender – NML Refurbishment Works to Lower Horseshoe Flooring

National Museums On Merseyside

Open opportunity – This means that the contract is currently unfulfilled but active, and the buying department is looking for potential suppliers to contact them with bid applications.

Contract summary

Industry – Construction and Real Estate, Other Services

Location of contract – North West

Value of contract —

Published date – 05 July 2017

Closing date – 20 July 2017

Contract start date – 07 August 2017

Contract end date – 08 September 2017

Description

Lower Horseshoe Gallery is situated on the 2nd floor of World Museum Liverpool, L3 8EN and is approx. 980 sqm.

The room has been use predominantly for functions and events, and housing of temporary kitchen facilities over the last few years and over time the floor has become marked and damaged in area.

The Lower Horseshoe gallery will be has been chosen to be the gallery that exhibits the Terracotta Warrior Exhibition which will open to the public in early 2018.

Prior to Exhibition fit-out works taking place, the flooring within the gallery will need to be require thoroughly sanded, all existing stains, scratches and damage to end matchings will need to be renewed as part of the works. Refer to detailed specification (section 5)

Contractors are asked to submit a formal tender for the repair, refurbishment and re-sealing of the Lower Horseshoe floor, as identified on drawing ‘LHS Floor Sanding Drawing’ (Appendix G).

Tendering is required by NML’s procurement processes that ensure that NML is adhering to Managing Public Money guidelines.

Please see attached for tender response instructions and supporting documents

About the buyer

Contact name – Ian Lindsay

Address:

127 Dale St
Liverpool
L2 2JH
England

Email – [email protected]

Other information

Attachments

Tender Specification

WML Lower Horseshoe Flooring – Tender.docx

Form of Tender

Appendix A – T2 Form of Tender.doc

Appendix B – NML Supplemental Conditions

Appendix B – NML Supplemental Conditions.doc

Appendix C – Safety Guidelines for Contractors 2015

Appendix C – Safety Guidelines for Contractors 2015.doc

Appendix D – H & S Questionnaire

Appendix D – H & S Questionnaire.doc

Appendix E – NML Procurement Protocol

Appendix E – NML Procurement Protocol.docx

Appendix F – NML Small Works & Services Contract T & C’s

Appendix F – NML Small Works & Services Contract T & C’s.doc

Appendix G – LHS Floor Sanding Drawing

Appendix G – LHS Floor Sanding Drawing.pdf


How to apply

Please apply directly to the buyer using the contact details provided

Tags
Show More

Floors Magazine

Floorinsite.com brings you daily flooring news, features, tenders, events, jobs and everything in-between.

Related Articles