The London Borough of Hillingdon require further provision for secondary school spaces for pupils with Moderate Learning Difficulties (MLD) and autism spectrum disorder (ASD). The Council agreed to progress with this project known as (Northwood Road,Harefield) to design and build a brand-new satellite school off Northwood Road in Harefield, Uxbridge, Hillingdon. • The erection of academic building (Use Class F1), along with and ancillary structures including heat pump and substation enclosures, construction of a multi-use games area, revised vehicular access, landscaping, car and cycle parking and associated works). • This brand-new permanent satel

London Borough of Hillingdon

Published date: 29 January 2025

Open opportunity – This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Contract summary

Industry

  • Construction work – 45000000
  • Construction work for school buildings – 45214200
  • Building completion work – 45400000

Location of contract

UB8 1UW

Value of contract

£12,000,000

Procurement reference

4a0410e2-8fe6-4bfe-8f72-c2cbdd27c225

Published date

29 January 2025

Closing date

7 March 2025

Closing time

1pm

Contract start date

2 June 2025

Contract end date

31 August 2026

Contract type

Works

Procedure type

Open procedure (above threshold)What is an open procedure (above threshold)?

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The London Borough of Hillingdon require further provision for secondary school spaces for pupils with Moderate Learning Difficulties (MLD) and autism spectrum disorder (ASD). 

The Council agreed to progress with this project known as (Northwood Road, Harefield) to design and build a brand-new satellite school off Northwood Road in Harefield, Uxbridge, Hillingdon. 

• The erection of academic building (Use Class F1), along with and ancillary structures including heat pump and substation enclosures, construction of a multi-use games area, revised vehicular access, landscaping, car and cycle parking and associated works). 

• This brand-new permanent satellite school for the London Borough of Hillingdon along Northwood Road, Harefield) is to accommodate up to 100 pupils and was to be completed with Practical completion due to be June 2026. 

• This new site was purchased from and is adjacent to Harefield School, owned and run by an Academy Trust, and which is completely separate to the above new site owned by the London Borough of Hillingdon who purchased the land from the academy trust. 

A limited number of works have commenced by a previous contractor which unfortunately went into administration. The demolition work is 100% complete and the piling is 99% complete, with groundworks 10-15% complete.

See tender pack for full details.


More information

Links


How to apply

Follow the instructions given in the description or the more information section.


About the buyer

Contact name

Wayne Toovey

Address

Civic Centre, High Street
, ,
Uxbridge
UB8 1UW
UNITED KINGDOM

Telephone

000

Email

[email protected]

Source: Contracts Finder licensed under the Open Government Licence v.1.0.

Show More

Floors Magazine

Floorinsite.com brings you daily flooring news, features, tenders, events, jobs and everything in-between.

Related Articles

Back to top button